EATON CH Series Main Breaker Loadcenters


Eaton CH Series main breaker loadcenters are the primary point of distribution for electrical power in a building. They are metal boxes that house the main breaker and smaller circuit breakers.

Filter
StyleModelPrice (ex. VAT)
A
CH18B100C
€284.51
B
CH36B200EGPK
€2,027.31
C
CH42PM400
€4,423.37
RFQ
C
CH42PM300
€4,843.16
C
CH42B3225R
€2,061.53
D
CH42BPN200K
€477.89
C
CH42B3225L
€1,420.59
E
CH42B200KRN
€781.53
F
CH42B3200R
€1,869.62
F
CH42B3200L
€1,327.02
C
CH424PM400
€4,987.10
C
CH424PM300
€5,908.24
G
CH42B200V
€492.37
H
CH36B200EGP
€1,489.17
I
CH22B100CRN
€488.08
H
CH32B200R
€783.47
J
CH32B200JRN
€819.85
K
CH30B3225L
€1,606.22
K
CH30B3200L
€1,185.92
K
CH30B3225R
€2,076.40
K
CH30B3150R
€1,681.07
K
CH30B3200R
€1,681.07
L
CH30B100R
€462.97
K
CH30B3150L
€1,257.93
M
CH30B125R
€789.19
N
CH22B100V
€289.10
O
CH8B200RFP
€886.35

Frequently Asked Questions

Where to install loadcenters?

Eaton main breaker loadcenters are installed near the point where the electrical service enters the building, usually in a utility room or outside near the electric meter.

When do I need to replace my loadcenter?

You must replace your loadcenter if you encounter the following conditions:

  • Frequent tripped breakers or blown fuses.
  • Rust or corrosion on the panel or components.
  • A burning smell or smoke coming from the panel.
  • Signs of physical damage such as dents or cracks.
  • Frequent power outages or surges.

Can I use a loadcenter for a generator?

Loadcenters can be used for generators on ensuring that the loadcenter and generator are properly sized and compatible. Also, the generator must be connected to loadcenter via a transfer switch.

Can a load center be used for a 3-phase system?

Yes.

We are here to help!

Looking for a part not listed here?